Station Street Dam & Bridge EA

Project Background

The Town of Erin held a Public Information Centre May 19th, 2016 for the Hillsburgh Dam and Bridge located along Station Street, approximately 150m west of Trafalgar Road, crossing the Upper West Credit River in Hillsburgh.  In 2011, the pond’s outlet pipe, within the earthen dam, failed and in 2012, emergency repairs were completed to fix the problem. A condition of the regulatory approval for the emergency repairs requires the Town to develop and implement a permanent solution for the dam. In addition, the bridge is nearing the end of its design life and is in need of upgrades to reduce the risk to traffic using the structure. The Town had initiated a Municipal Class Environmental Assessment to review options and identify the preferred alternatives to address both the deterioration of the bridge and a permanent solution for the dam.

The Process

This Environmental Assessment is being conducted as a Schedule B project in accordance with the “Municipal Class Environmental Assessment” (Municipal Engineers Association, October 2000, as amended in 2007 and 2011) which is an approved process under the Ontario Environmental Assessment Act. The Class Environmental Assessment process includes public and agency consultation; an evaluation of alternative solutions to address the problem; an assessment of potential environmental effects of the proposed improvements; and identification of reasonable measures to mitigate any potential adverse impacts.

What is a Municipal Class EA?

The planning and design of municipal infrastructure projects must meet the requirements of the Environmental Assessment Act, which is a provincially legislated document that governs all potential undertakings that have the potential to affect the natural, social, cultural, constructed or economic environments.

The Municipal Class Environmental Assessment (Class EA) applies to municipal infrastructure projects including roads, water, and wastewater projects. The Town of Erin Urban Centre Wastewater Servicing project is classified as a Schedule ‘C’ Class EA. Schedule ‘C’ projects are subject to a more in-depth examination of potential effects.

Study Documents

In this section you will find a link to all publically available project documents. This list of available documents will grow over the course of the project as environmental studies are completed and as public consultation activities occur.

Public Greeting

Problem Statement

Study Area

Existing Plan and Profile

Existing Stop Log Structure

Existing Natural Features

Existing Earthen Berm Dam

Existing Bridge

Hillsburgh Pond

Stage 1 Report - Archaeological Assessment

Cultural Heritage Evaluation and Heritage Impact Assessment

DRAFT - Natural Environmental Report - Hillsburgh Dam

Alternatives A and B

Alternatives C and D

Figure 1 - Alternative A and B

Figure 2 - Alternatives C and D

Figure 3 - Alternatives C and D

Preliminary Comparison and Ranking of Alternatives

Next Steps

 

Project File report

Project File Report

Appendix A

Appendix B

Appendix C-1

Appendix C-2 and C-3

Appendix C-4

Appendix C-5

Appendix C-6a

Appendix C-6b

Appendix C-7

Appendix D

Appendices E thru Fa

Appendix Fb


Notice of Study Completion

Station Street Dam and Bridge EA – Notice of Completion Extension

 

Contacts

Dina Lundy, Clerk
Town of Erin
5684 Trafalgar Road
Hillsburgh, ON N0B 1Z0
T (519) 855-4407 Ext 233
E dina.lundy@erin.ca

 

Paul Ziegler, C.E.T
Project Manager
Triton Engineering Services Limited
105 Queen Street West, Unit 14
Fergus, ON N1M 1S6
T (519) 843-3920

E pziegler@tritoneng.on.ca

Top